Backup Power Supply for the New Carlsberg Kazakhstan Plant - Sam
Написать Позвонить

Backup Power Supply for the New Carlsberg Kazakhstan Plant

End Customer: Carlsberg Kazakhstan Location: Almaty Region, Kazakhstan Equipment: 3 BAIFA Diesel Generator Sets

The equipment is fitted with Baudouin engines, Stamford alternators, and metal soundproof enclosures finished in a custom Midnight Graphite shade. The configuration has been developed to meet the specific technical requirements of the industrial facility and includes filter sets for the first scheduled maintenance service. Equipment Warranty: 24 months.

Project Description:

As part of the construction of the new Carlsberg Kazakhstan production facility, representing an investment of USD 344 million, SAM GROUP is supplying three BAIFA diesel generator sets to provide backup power for the plant.

Project Outcome:

Establishment of a reliable backup power supply system to ensure uninterrupted production processes at one of Kazakhstan’s largest food and beverage manufacturing facilities.

Other projects